Brief description The main purpose of this position is to manage technical information technology (IT) infrastructure projects within the South African Reserve Bank (SARB) by leading, planning, organising and controlling resources in accordance with the SARB’s
WSP Africa is seeking a talented and detail-oriented Project Planner to join our growing Power & Energy Project Management Office (PMO). This is an exciting opportunity to work on large-scale power generation, transmission, distribution, renewable energy, substations,
Greif is a global leader in performance packaging located in 40 countries. The company delivers trusted, innovative, and tailored solutions that support some of the worlds most in demand and fastest-growing industries. With a commitment to
Clerk of Works – Underground Mining Our client in Brits is looking for a Clerk of Works – Underground Mining to join their team. Qualifications Grade 12 (NQF4) Valid Mine Overseer Certificate of Competency (advantageous) Job-specific experience Minimum
Clerk of Works – Underground Mining Our client in Brits is looking for a Clerk of Works – Underground Mining to join their team. Qualifications Grade 12 (NQF4) Valid Mine Overseer Certificate of Competency (advantageous) Job-specific experience Minimum
Description: Hire Resolves Client is currently looking for an experienced Project Engineer to join their mining company based in Mpumalanga. You will be responsible for managing engineering and infrastructure projects from concept through to completion, ensuring
POSITION: MAINTENANCE ELECTRICIAN Location: Pinetown, Durban Industry: Automotive Component Manufacturing Remuneration: R140 to R260 per hour CTC, commensurate with qualifications and experience Reporting to: Maintenance Supervisor / Maintenance Manager Purpose of the Position An established automotive
Company Description SGS is the world’s leading inspection, verification, testing, and certification company. SGS is recognized as the global benchmark for quality and integrity. With more than 97,000 employees, SGS operates a network of over 2,600
Company Description SGS is the worlds leading inspection, verification, testing and certification company. We are recognised as the global benchmark for quality and integrity. With more than 89,000 employees, we operate a network of more than
Applicants are required to strictly meet the following criteria: N4 Qualified Fitter recognised apprenticeship & Trade test (section 13) Experienced as a Mechanical Maintenance Supervisor Proven track record of applying and controlling maintenance management systems Experienced
Minimum Requirements Grade 12 (Matric) Essential. Qualification in Office Management, Information Management or a related field (NQF Level 6 or equivalent). Minimum 510 years experience as a Document Controller, Project Administrator, or Maintenance Administrator within the
Key Responsibilities Project Planning and Governance Ensure all project requests are formally documented and managed through the appropriate project governance and approval processes. Develop project charters, business cases, scope statements, and project plans. Establish project objectives,
Minimum Requirements: Qualifications: National Diploma in Engineering (NQF 6) with a Trade Test / S4/ T3 Bachelors Degree in Engineering will be advantageous Certifications: Working towards obtaining Government Certificate of Competency (Mines and Works) Reliability Centred Maintenance
Supporting production to meet machine efficiency targets Maintenance and repairs are carried out as per instruction/ plan, meeting all the quality requirements. Breakdowns are repaired with the minimum production downtime Execute effective production safety/housekeeping Assess the problem
Minimum Requirements Grade 12 (Matric). Minimum of 12 years experience as a Boilermaker Assistant within the mining industry. Previous underground mining experience will be advantageous. Basic knowledge of welding, fabrication and mechanical repairs. Experience assisting with
Our client in the construction sector is currently hiring for lead, manage, and industrialiser of the organisation’s full commercial tendering office, including the bid production lifecycle, technical-commercial costing, NEC contract administration support, and revenue pipeline development.
Mine Overseer Requirements (Over and above normal position compliance): The candidate must have relevant 5 years minimum underground mining experience at the correct role level. The candidate must have 3 years minimum contractor-side mining experience, preferably
Mine Overseer Requirements (Over and above normal position compliance): The candidate must have relevant 5 years minimum underground mining experience at the correct role level. The candidate must have 3 years minimum contractor-side mining experience, preferably
SUMMARY: Our client in Brits is looking for Reliability Engineer to join their company POSITION INFO: Minimum Requirements: Qualifications : National Diploma in Engineering (NQF 6) with a Trade Test \/ S4\/ T3 Bachelors Degree in
Unilever is currently hiring for Millwright Artisan Function : Supply Chain Reports to: Plant Engineer Scope: Local Location: Boksburg Terms & Conditions: Full-time ABOUT UNILEVER With 3.4 billion people in over 190 countries using our products