About the Role The Production Planner is responsible for planning and coordinating the execution of the Master Production Schedule (MPS) to ensure the timely and cost-effective availability of materials and the efficient flow of production activities.
About the role The Product Industrialisation Manager is responsible for leading the industrialisation of new and existing products from concept through to full-rate production. The role ensures that engineering designs are translated into robust, repeatable, cost-effective